
Find the hours your machines are losing.
This module records running hours, stoppages with reasons, output and rejection for every machine and shift. From these it shows OEE, which is how much of the available time actually produced good output, and the main causes of lost production. It matters because many factories have more capacity than they think, hidden in small stops.
Records running hours, stoppages with reasons, output and rejection for each machine and shift. Shows OEE (how much of the available time produced good output) and the main causes of lost production.
Inside the module.
Shift-wise machine log
Record running time, idle time, output and rejection per machine each shift.
Stoppage reasons
Tag each stop: breakdown, no material, no operator, changeover, power or quality.
OEE calculation
See availability, performance and quality for each machine, and the combined OEE.
Top loss causes
Rank reasons by hours lost, so the biggest one gets fixed first.
Expected versus actual
Compare output with what the cycle time or speed says it should be.
Trend by machine
Follow each machine's OEE over weeks to see if actions are working.
Part of 4 products.
Steel Plant ERP
Steel plant ERP software from Kreon runs an induction furnace, rolling mill or integrated TMT plant by weight and heat number.
View ManufacturingPlastic Manufacturing ERP
Kreon's plastic manufacturing ERP software is built for injection, blow and extrusion units, whether you make your own range or…
View ManufacturingAuto Components ERP
Kreon's auto parts manufacturing ERP is for component makers who supply vehicle manufacturers and larger component companies.
View ManufacturingPackaging and Corrugation ERP
Kreon's corrugated box ERP software is for box plants and carton printers.
ViewIndustries that rely on it.
Related modules.
- Job work and sub-contracting
- Production planning
- Bill of materials and recipes
- Quality control
- Wastage, scrap and yield
- Plant maintenance
- Product lifecycle management (PLM)
- Weighbridge integration
- Production costing
- Mould, die and tool management
- Warranty and replacement tracking
- Gate entry and gate pass
Questions, answered.
Does it need sensors on the machines?
No. It works on entries made by supervisors each shift. That is enough to find the main causes of lost time.
What is a good OEE figure?
It depends on your process and product mix, so comparing with other factories misleads. The useful comparison is your own machine against its past weeks, and one machine against a similar one.
How is this different from plant maintenance?
Maintenance looks after the machine: schedules, breakdowns and spares. OEE looks at all lost time, including no material, changeovers and slow running. Breakdown is only one part of it.
Which Kreon products include machine downtime and OEE tracking?
Steel Plant ERP, Plastic Manufacturing ERP, Auto Components ERP, Packaging and Corrugation ERP. It can also be added to a custom system.
Tell us what is slowing your business down.
We will tell you, honestly, whether software can fix it. If it cannot, we will say so.
